"MEMR - Aqaba Oil Terminal - Jordan - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "MEMR - Aqaba Oil Terminal - Jordan - Project Profile" is part of Timetric's database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary
Ministry of Energy and Mineral Resources (MEMR) is undertaking the Aqaba Oil Terminal (AOT) Development project in Jordan.

The project involves the construction of a 120,000m3 oil terminal. It includes the construction of six floating roof steel tanks to receive imported crude oil and oil products through pipelines from the oil jetty and a 28inches steel pipeline from the oil jetty to AOT.

The project also includes the construction of a booster pumps station and pipelines to transfer crude oil/oil products from AOT to the existing crude oil/oil products tanks at a higher location i.e. 130m above sea level, piping system between AOT components, crude oil/oil products road tankers loading facilities including loading pumps, loading racks and two electronic weighbridges.

The project involves the construction of surface water and oily waste water systems with oil separators and effluent water treatment, sanitary water and sewage treatment system, fire fighting and cooling water system and roads inside the storage terminal.

The project also includes the construction of electrical power supply system including receiving facilities, substation, electrical distribution system, transformer, panels, lighting poles, lighting towers and cables.

The project also includes the instrumentation including supply and installation of all required instruments, cables, cathodic protection system for tanks bottoms and pipelines, control and safety systems, emergency shutdown system, fire and gas detection systems and closed circuit television.

It also includes the construction of telephone communication system, instrument air and plant air system, maintenance workshop, offices and control room, potable water supply system, security fencing and control towers and all other components necessary to form a complete, safe and suitable oil terminal.

MAG Engineering & Contracting has been appointed as Sub-contractor, Dar as project manager and ILF Consulting as Front End Engineering Design (FEED) consultant.

On May 23, 2012, Request for Qualification (RFQ) was issued for the EPC Contract with June 21, 2012 as the submission deadline; however the submission deadline was later extended to July 3, 2012.

In September 2012, thirteen companies including the China Dalian International Coop Group, China National Petroleum Corporation, Drake & Scull and Essar Projects, Engineering for the Petroleum and Process Industries - Orascom Construction, Entrepose Contracting, Habtoor Leighton Group, IOT Infrastructure & Energy Services, J&P Avax, Lotte Engineering & Construction, OHL Industrial Industries, Petrojet, Polimex Cekop Engineering & Construction and Ssangyong and Kolon Engineering and Construction were selected as the pre-qualified bidders.

In the third quarter 2012, Request for Proposal (RFP) was issued with November 8, 2012 as the submission deadline and later it was extended to December 20, 2012.

In October 2013, nine companies submitted the bids. They are Enppi and Orascom Construction, CNPC Northeast Refining & Petrochemical Engineering, OHL Industrial (Ecolaire Group): Consolidated Statements, China Dalian International Economic & Technical Coop Group, Petrojet, IOT Infrastructure & Energy Services Limited, Drake & Scull and ESSAR Projects, Habtoor Leighton Group and Entrepose Projects.

In February 2014, China Dalian International Economic & Technical Coop Group was appointed as EPC contractor.

Construction works are underway.

Scope
The project involves the construction of a 120,000m3 oil terminal in Aqaba, Jordan.

The US$80 million project includes the following:

1. Construction of six floating roof steel tanks to receive imported crude oil and oil products through pipelines from the oil jetty

2. Construction of 28 inches steel pipeline from the oil jetty to AOT

3. Construction of booster pumps station and pipelines

4. Construction of a piping system

5. Construction of surface water and oily waste water systems

6. Construction of a effluent water treatment system

7. Construction of a sanitary water and sewage treatment system

8. Construction of a fire fighting and cooling water system

9. Construction of roads inside the storage terminal

10. Construction of an electrical power supply system

11. Construction of a cathodic protection system

12. Construction of pipelines

13. Construction of control and safety systems

14. Construction of an emergency shutdown system

15. Construction of a fire and gas detection system

16. Construction of a telephone communication system

17. Construction of an Instrument air and plant air system

18. Construction of a maintenance workshop

19. Construction of offices and control room

20. Construction of a potable water supply system

21. Construction of security fencing and control towers

Reasons To Buy
• Gain insight into the project.
• Monitor the latest project developments.
• Identify key project contacts.

Single User License: Report will be emailed in PDF format and can be accessed by a specific user. This License type allows the report to be Printed.
Site License: Report will be emailed in PDF and  allows only employees within the same geographical location within the organization to access it.  This License type allows the report to be Printed.
Why http://www.marketreportsonline.com/
MEMR - Aqaba Oil Terminal - Jordan - Project Profile
Published By :Timetric
Price
How to Purchase
Purchase reports from our site in few easy clicks. Please follow the description given below to complete your purchase process.
Step 1:
Select the report title of your interest, and Click on Buy Now button next to the Price option.
Step 2:
You will arrive at the Purchase page, where you will be requested to Signup (New User) or Login (Registered User). Please note that in-keeping with the security check on the website, you must submit your full details to avoid any inconvenience arising from incorrectly entered data or counterfeit information.
Step 3:
After SignUp/Login, you will arrive at our Payment Page on Paypal. You will see your Order Summary as well as an option to Choose a way to pay. Select a Payment option from Pay with a Paypal account OR Pay with a Debit or Credit Card. MarketReportOnline accepts Visa, MasterCard, American Express and Discover through Paypal. Fill up the required details in the option of your choice.
Step 4:
Once you follow the required process in Step 3 as mentioned above, you have successfully completed the purchase process.
Step 5:
Once you have successfully completed the purchase process, you will receive a confirmation email. The report will then be emailed to you directly by the publisher, as per our agreement with the publisher. For Orders that are placed after working hours, the delivery of the reports will be made on the next business day. For orders that are placed during weekends, the delivery of the reports will be made on the next 'working' business day. Please note, if you select purchase by invoice, you will receive your report only once the payment has been received. If you have any queries about how to order, please Contact Us.
We use cookies to deliver the best possible experience on our website.
By continuing to use this site, or closing this box, you consent to our use of cookies. To learn more, visit our Privacy Policy